GNY Pit Installation
GNY Pit Installation
Pit shown with associated pipe work and interior equipment fittings. This Model 6000 pit will be backfilled in position and concrete will be pored over the the top 12″. This pit form has a split top to allow for adjustment in the field.
Model 6000 (Cover Removed)
Pit Shown during installation.